by admin | Sep 26, 2016 | Extreme weather |
Over the past few decades, changes in weather patterns due to climate change or global warming have led to more extreme, frequent, and costly weather events that have included intense rains, ice storms, tornadoes, floods, hurricanes, heat waves, droughts, and... by admin | Sep 23, 2016 | Sustainable energy |
Following the Western Energy Crisis of 2000 and the Major East Coast Blackout of 2003 – that was attributed to some degree to excessive conductor sag – CTC Global, based in Irvine, California developed and commercialized a high-capacity, low-sag overhead... by admin | Sep 2, 2016 | Grid Efficiency |
Regulators, grid operators, generation companies and transcos can work together to leverage CTC Global ACCC Conductor technology technology to increase grid efficiency, capacity and reliability – in parallel with reducing emissions associated with climate change. In... by admin | Jul 15, 2016 | CTC ACCC Conductor project |
With the help of EPC firm Trenergy Infrastructure, CTC Global ACCC conductor stringing began on a new transmission line in Johor – Baharu, Malaysia. The new line is being built to enable connection with a new power plant developed by Petronas. The project is a...
Recent Comments